Purchasing skills of drain pump

Date of issue:[2020-08-17]     Click through rate:    

The drainage pumps used in the building include submersible sewage pump, underwater drainage pump, vertical sewage pump and horizontal sewage pump. As the general site in the building is small and the displacement is not large, the submersible sewage pump and submerged drainage pump can be preferred for the drainage pump, among which the submerged sewage pump is generally used in important places; the vertical sewage pump and horizontal sewage pump are required to be equipped with isolation foundation, self irrigation water absorption, and occupy a certain space, so they are rarely used in buildings.

The flow rate of the drainage pump should be selected according to the design second flow rate of domestic drainage; when there is displacement adjustment, it can be selected according to the maximum hourly flow of domestic drainage. The flow rate of drainage pump in fire elevator sump shall not be less than 10L / s. After the head of the drainage pump is determined according to the lifting height and pipeline loss, a certain free head is added. The free head should be 0.02-0.03mpa. The velocity of suction pipe and outlet pipe of drainage pump should not be less than 0.7m/s and should not be greater than 2.0m/s. A standby pump should be set in each domestic drainage sump in public buildings, which should be operated interactively at ordinary times. If there are two or more drainage pumps for the basement, equipment room and garage, the pump can not be used. When the emergency drainage pipe cannot be set in the sump, the pump shall have uninterrupted power supply; when the drainage inlet pipe can be closed, the uninterrupted power supply can not be set, but alarm device shall be set.

When lifting the sewage and wastewater with large impurities, the outlet pipes of submersible sewage pumps in different catchments should not be discharged together; when lifting general wastewater, the outlet pipes of submersible sewage pumps in different catchments can be combined and discharged according to the actual situation. When two or more pumps share one outlet pipe, valves and check valves shall be installed on the outlet pipe of each pump. Check valve should be set when single pump drainage may cause backflow. It is not allowed to discharge the pressure drain and gravity drain pipe in the building. When the submersible sewage pump lifting contains large debris, the submersible sewage pump should be equipped with crushing device; when lifting sewage containing more fiber, large channel submersible sewage pump should be used.

When the motor power of submersible sewage pump is greater than or equal to 7.5kW or the outlet diameter is greater than or equal to DN 100, the fixed auto coupling device of the pump can be used; when the motor power of the submersible sewage pump is less than 7.5kW or the diameter of the outlet is less than DN 100, the mobile installation of the hose can be set. When the submersible sewage pump is used to drain the sewage sump, the pump fixed auto coupling device should be set to facilitate the maintenance of the pump. The drainage pump shall be able to start and stop automatically and manually on site. Multiple pumps can be operated alternately in parallel or in sections.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

主站蜘蛛池模板: 72成人网| 91精品啪在线观看国产色 | 国产精品三区四区 | 久久精品久久久久 | 色交视频| 国产综合激情在线亚洲第一页 | 久久精品国产一区二区三区肥胖 | 加勒比精品久久一区二区三区 | 日韩中文字幕在线免费观看 | 视色 4se| 精品一区二区三 | 久久91精品国产91久久 | 国产亚洲精品福利片 | 91免费国产在线观看 | 一区二区三区中文国产亚洲 | 免费看美女扒开腿让男人桶 | 欧美色tv| 国产欧美一区二区精品性色tv | 亚洲第一色网站 | 一级做a爰片久久毛片看看 一级做a爰片久久毛片毛片 | 精品日韩二区三区精品视频 | 亚洲精品乱码国产精品乱码 | 亚洲女人在线 | 色帽子影院 | 欧美噜噜噜| 国产精品成人免费视频 | 91在线视频精品 | 制服丝袜日日 | 国产精美视频 | 国产特黄1级毛片 | 亚洲香蕉网久久综合影院3p | 国产成人精品影视 | 欧美另类极品videosbest视 | 国产福利一区二区 | 四虎影视久久久 | 国产成人理在线观看视频 | 国产一区在线观看免费 | 精品精拍国产日韩26u | 亚洲爱婷婷色婷婷五月 | 草色在线 | 日日噜噜夜夜狠狠tv视频免费 |